For instance an old concrete floor that was tiled previously will probably not need a primer as long as the surface is clean and free from old adhesive and anything else that was stuck to the floor.
Do you have to seal concrete before tiling floor.
A freshly screeded floor should be sealed before tiles are fitted unless a screed has been used that does not need sealing priming this screed is usually dust free so it seems as yours would require sealing for tiling.
For that reason it is best to use an elastomeric crack.
Before you lay any sort of tile whether it is stone ceramic or peel and stick vinyl you must prepare your concrete floor to ensure that the tiles will go down properly and stay where they re.
After laying all the tile over the surface of the concrete slab allow the tile to rest for 24 hours before finishing the tile.
Sealing your basement floor before installing carpet is a good idea.
Use filler to fill in any dips and apply a floor leveler for any humps in the floor.
This is particularly imported when laying tile as the floor needs to be as level as possible.
How to seal a concrete floor for tiling.
Before using the sealer ensure that it is mixed thoroughly.
Step 3 mix.
Also ensure that the concrete is level.
Seal off the area with poly sheeting.
Before you even consider the priming of a wooden floor you need to be satisfied that the floor construction is suitable.
From my understanding the screed will not need sealing if you are only going to fit laminate or carpet.
Although you don t need to install an underlayment between the concrete and the tile you need to prepare the surface before placing the tile.
Jul 5 2010 1.
Installing carpet also helps to insulate the interior of a basement by keeping the floor warm in cold weather.
Cement on top of slab is solid and not flaky i dont worry about it i like the glue to be absorb into the slab but if u seal could not absorb u dammed if u dont and dammed if u do been tiling 29 years.
If you re unsure about yours remove a tile and send it to a local asbestos abatement firm for testing.
Concrete contracts and expands at a different rate from the thinset mortar used to install tiles.
Use grout to fill in the cracks between the tiles.
If it tests positive follow these asbestos abatement procedures.
After all cracks and uneven areas in the concrete can cause damage to the tile above and uncontrolled moisture in the concrete can destroy the mortar and loosen the tiles.