But one thing that this top called the floor covering does not have to do is to provide structural support.
Do interior walls sit on top of floor joists.
I wasn t expecting this.
If you cut the sub floor sheeting right next to the drywall you have no way to tie the floor under the wall to the new floor.
The rim joist boards typically 2 by 10s or 2 by 12s install edgewise around the perimeter of the first floor top wall plate also called the tie plate.
Instead i was expecting to see the floor joists sitting on top of the foundation wall.
2 bolt the wall plate lower in the bricks concrete under the insulation and sit wall plate on top.
What are the pros cons of doing it one way or the other when it comes to installing exterior foam on the above grade walls installing interior foam on the.
A floor s framework is made up mostly of wooden joists that run parallel to one another at regular intervals.
Some newer homes have manufactured i beam shaped joists.
Plans often are drawn that show in the floor joist layouts off layout extra joists located under nonbearing walls that run parallel to joists.
Joists can rest on top of beams or they can rest in structural hangers mounted onto the sides of beams so that the joists and beams are flush along the top and bottom.
Ceiling joists are usually 2 by 6s or sometimes 2 by 4s if it is an older home.
3 get masonry hangers that are shorter than joists.
The hangers drop the floor joists below the top of the concrete foundation.
Floor joists are typically 2 by 8s 2 by 10s or 2 by 12s.
When a load is applied to a joist the wood fibers along the bottom edge go into tension and those along the top go into compression fig.
Leave 1 1 2 of floor to nail through into new blocking either running with the floor joists or between them and nail the perimeter of new floor into the flat blocks also.
Relying on the joists to shoulder the brunt of the load means that this floor top can be practically anything you like as long as it performs a few basic duties like withstanding foot traffic.
1 like the rest of the existing floor build a 3 brick course wall on top of the concrete oversite 50mm and sit dpc and a wall plate on top then sit the joists on top of the wall plate.
When i draw plans i locate joists under bearing walls only for parallel walls off layout but i do it with two joists spaced apart the depth of wallplates above.